Office Relocation Checklist

From six months out to your first week in the new office.

A practical, step by step checklist for businesses moving office in Manchester, Liverpool and the North West.

The inside of an office.

Plan your office move in stages

Moving office takes more planning than most businesses expect. This checklist breaks the job into stages, from six months before the move to the weeks after it, so nothing important is left to the last minute.

Use it alongside your own project plan and share it with whoever is managing the move. Further down, you will find notes on the six areas that most often cause problems: IT and phones, staff, furniture and disposal, landlord and building access, packing and labelling, and storage.

STAGE 1

Six months before your move

Confirm your move date and the notice period on your current lease.

Read your lease for dilapidations and the condition the office must be left in.

Choose an internal move lead and a small team to support them.

Measure the new office and plan where each team and desk will go.

Book surveys with removal companies and ask each for a fixed, written quote.

Tell your IT provider and phone supplier your planned move date.

STAGE 2

Three months before

Choose your removal company and agree the plan and schedule with them.

Ask both landlords or building managers about access, lifts, loading bays and parking.

Check whether an evening or weekend move needs approval from either building.

Plan the IT move with your IT team: cabling, servers, internet connection and phone lines.

Decide which furniture is moving, which is new and which needs to be disposed of.

Arrange storage if you need to hold furniture or archive boxes between sites.

Tell staff the move date and how it will affect them.

STAGE 3

One month before

Confirm the final floor plan and give every desk and room a number.

Agree a colour coded labelling system for each department or floor.

Have crates delivered so staff can start packing files and archive boxes.

Order signage, stationery and business cards with the new address.

Update your address with clients, suppliers, your bank, insurers and Companies House.

Confirm the internet and phone lines will be live at the new office before moving day.

STAGE 4

The week before

Give each member of staff crates and labels for their own desk.

Back up all data and agree the order IT equipment will be disconnected.

Clear out paperwork and anything that is not coming with you.

Share a moving day plan with staff, including where to go on the first morning.

Confirm timings, lifts, access and parking with both buildings.

STAGE 5

Moving day

Have your move lead, or someone they trust, on site at both buildings.

Walk the old office with the removal team before the first load leaves.

Move IT first so it can be set up while furniture goes into place.

Check crates and furniture go into the right rooms using your numbered floor plan.

Walk the new office with the move manager and sign the move off once everything is in place.

STAGE 6

After the move

Check every desk has its equipment and that phones and systems are working.

Arrange for crates to be collected and unwanted furniture to be taken away.

Hand the old office back in the condition agreed in your lease, and get written confirmation.

Update your website, email signatures and Google Business Profile with the new address.

Ask staff to report any snags in the first week and fix them quickly.

WHAT TO WATCH

Six areas that need extra planning

IT and phones

IT usually decides whether you are working again on the first morning. Involve your IT team or provider early, book internet and phone line installation well ahead, and plan the move so key systems go first. At Dolphin Removals & Storage we always protect IT equipment through anti static crates and screen covers.

Staff

It is important to let your staff know early and keep them updated. Give each person clear packing instructions, crates and labels, and a simple plan for the first morning, including where they sit and how to get into the building.

Furniture and disposal

Decide early what is coming with you. Furniture you no longer need can often be cleared as part of the move, so ask your removal company whether they hold a commercial disposal licence and can give you recycling certificates.

Landlord and building access

Both buildings will have rules about when you can move, which lifts you can use and where vehicles can park. Get them in writing, book lifts and loading bays in advance, and check the terms for handing the old office back.

Packing and labelling

A colour coded label for each department or floor, matched to a numbered floor plan, means every crate ends up at the right desk. Pack and label IT separately so it can be unpacked first.

Storage

If the new office is not ready, or you are moving in phases, our business storage lets you clear the old building on time. Work out early whether you will need it so it can be built into the plan.

Planning an office move?

Dolphin Removals and Storage has been family run since 2000, and we regularly move offices across Manchester, Liverpool and the North West. Every move starts with a free survey and a fixed written quote, with a named move manager from start to finish. Find out more about our office removals in Manchester and office removals in Liverpool, or call 0151 931 4441.

Liverpool: 0151 931 4441 Manchester: 0161 567 9322

Your cookie choices

Cookies on Dolphin Removals

We use a few cookies and similar tools to keep this site working and, if you agree, to count visits so we can improve it. You can change your mind at any time using Cookie settings at the bottom of every page. Privacy Policy Cookie Policy